Before handing over the building to the owner, the maintenance time must be specified in the contract. In most cases, the maintenance period is from six months to one year. The terms of the agreement between the owner and the contractor include work to be worked, construction time, payment plans, escalating costs, delays, penalties, construction materials used, etc. For some types of construction projects, you may need administrative approvals in addition to the work contract before contractors can start working. The owner should be able to monitor the work done by the owner and require modifications based on his needs. The contractor is required to supply the goods and products in accordance with the contract. There should be communication between the owner and the contractor so that the project is carried out without any problems. In order for the liquidated damage to be maintained, the damage to the owner must be uncertain or difficult to determine in advance. In addition, the liquidated damage must be a reasonable amount and cannot be a penalty.

And the delay in construction cannot be due to circumstances that are not controlled by the contractor, such as.B. changes in work or extreme weather. c) All authorized exemptions for which a rate or price have not been previously agreed are assessed and evaluated by the architect. Goods for which such a rate does not exist are treated by the contractor in the workplace, plus 15% of vat on the actual cost, plus actual costs, provided the architect correctly certifies these costs. If the contractor is late, the defects must be corrected and corrected within the time indicated by the architect/owner. Information on the type of materials used for construction should be included in the agreement. If the compromise clause is mentioned in the agreement, the dispute should be settled out of court. You should understand that arbitration is the least expensive and billing will be done quickly. If you sign the agreement with the compromise clause, you do not have the right to take the matter to court. (9) The contractor works in coordination with other organizations working on the building. It gives them all cooperation and support. The completion date is not extended to this account.

The contractor must rectify the damage caused by the building`s electricity, sewerage and water supply work, which must be paid accordingly.